Details.
Professional wooden floor installation, including site assessment, timber preparation, installation using glue or joists as appropriate, sanding, and application of oil or water based finishing. Flooring boards should be on site at least three weeks before installation to acclimatize. The concrete floor must be smooth, levelled, and waterproofed.
