Details.
Without a subscription, charging costs 0.44 €/kWh at 3.7 kW, 0.53 €/kWh at 3.7 to 22 to 25 kW, and 0.63 €/kW at 150 to 180 kW on Express stations. Post-charge fees apply after 10 minutes without charging: 0.10 €/min at 3.7 kW, 0.10 €/min at 3.7 to 22 to 25 kW, and 0.20 €/min at 150 to 180 kW. On Neuilly-sur-Seine, the post-charge rate is 0.20 €/min during the day from 8:00 to 20:00 and 0.10 €/min at night from 20:00 to 8:00. A rate of 0.20 €/min applies to 22 kW chargers located at ultra-fast Express stations.
